Americas Engineers Project

AEI personnel (while an employee of another consultant firm) was involved in the contract to provide design support to AECOM for the reconstruction of I-595 corridor as well as all associated improvements to adjacent crossroads, frontage roads, and ramps from the I-75/Sawgrass Expressway interchange to the I-595/I-95 interchange on I-595 and from Peters road to Griffin road on Florida's turnpike, for a total project length of 13 miles.  Highlights of the major improvements include tolled reversible ground level express lanes serving express traffic from/to I-75 with a direct connection to median of Florida turnpike, geometric improvements to I-595/Florida turnpike interchange, addition of auxiliary lanes on the east bound and westbound I- 595 and SR-84 and accommodation of a transit envelope within the corridor.
AEI personnel:

  • Generated roadway cross-sections for Zone-3, and roadway plans, cross-sections for Zone-8A and Zone-8B.

  • Prepared drainage structure sheets for Zone-7, Zone-8A and Zone-8B using ASAD and GEOPAK.

  • Designed Storm Water Pollution Prevention Plans (SWPPP) for Zone-8A and Zone-8B.

  • Assisted Project Manager in the overall coordination of utility activities and generated design base files utilized by all the zones. Utility Co-ordination tasks performed include utility layout and QA/QC for conflicts of miscellaneous walls and bridge foundations with utility plans.

Services Provided:

Traffic / Transportation Engineering

 